期刊


ISSN1474-0346
刊名Advanced Engineering Informatics
参考译名先进工程信息学
收藏年代2003~2023

关联期刊参考译名收藏年代
Artificial Intelligence in Engineering工程学中的人工智能2001~2001


全部

2003 2004 2005 2006 2007 2008
2009 2010 2011 2012 2013 2014
2015 2016 2017 2018 2019 2020
2021 2022 2023

2010, vol.24, no.1 2010, vol.24, no.2 2010, vol.24, no.3 2010, vol.24, no.4

题名作者出版年年卷期
Data management for animation of construction processesWolfgang Huhnt; Sven Richter; Steffen Wallner; Tarek Habashi; Torsten Kramer20102010, vol.24, no.4
Ontological product modeling for collaborative designConrad Bock; XuanFang Zha; Hyo-won Suh; Jae-Hyun Lee20102010, vol.24, no.4
A flexible and dynamic algorithm for assessment and optimization of utility sectorsA. Azadeh; H. Eivazy; M. Moghaddam20102010, vol.24, no.4
An intelligent localization algorithm using read time of RFID systemSunhong Park; Shuji Hashimoto20102010, vol.24, no.4
A three-stage framework for introducing a 4D tool in large consulting firmsMeng-Han Tsai; Shih-Chung Kang; Shang-Hsien Hsieh20102010, vol.24, no.4
Multi-dimensional building performance data management for continuous commissioningAmmar Ahmed; Joern Ploennigs; Karsten Menzel; Brian Cahill20102010, vol.24, no.4
Toward automated generation of parametric BIMs based on hybrid video and laser scanning dataIoannis Brilakis; Manolis Lourakis; Rafael Sacks; Silvio Savarese; Symeon Christodoulou; Jochen Teizer; Atefe Makhmalbaf20102010, vol.24, no.4
Modeling and monitoring of construction supply chainsJack C. P. Cheng; Kincho H. Law; Hans Bjornsson; Albert Jones; Ram D. Sriram20102010, vol.24, no.4
Tracking multiple workers on construction sites using video camerasJ. Yang; O. Arif; P. A. Vela; J. Teizer; Zhongke Shi20102010, vol.24, no.4
Task network-based project dynamic scheduling and schedule coordinationQi Hao; Weiming Shen; Yunjiao Xue; Shuying Wang20102010, vol.24, no.4
12345