期刊


ISSN0268-3768
刊名The International Journal of Advanced Manufacturing Technology
参考译名先进制造技术国际杂志
收藏年代1998~2024



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023 2024

2009, vol.40, no.11-12 2009, vol.40, no.1-2 2009, vol.40, no.3-4 2009, vol.40, no.5-6 2009, vol.40, no.7-8 2009, vol.40, no.9-10
2009, vol.41, no.11-12 2009, vol.41, no.1-2 2009, vol.41, no.3-4 2009, vol.41, no.5-6 2009, vol.41, no.7-8 2009, vol.41, no.9-10
2009, vol.42, no.1/2 2009, vol.42, no.11/12 2009, vol.42, no.3/4 2009, vol.42, no.5/6 2009, vol.42, no.7/8 2009, vol.42, no.9/10
2009, vol.43, no.1/2 2009, vol.43, no.11/12 2009, vol.43, no.3/4 2009, vol.43, no.5/6 2009, vol.43, no.7/8 2009, vol.43, no.9/10
2009, vol.44, no.1/2 2009, vol.44, no.11/12 2009, vol.44, no.3/4 2009, vol.44, no.5/6 2009, vol.44, no.7/8 2009, vol.44, no.9/10
2009, vol.45, no.1/2 2009, vol.45, no.11/12 2009, vol.45, no.3/4 2009, vol.45, no.5/6 2009, vol.45, no.7/8 2009, vol.45, no.9/10

题名作者出版年年卷期
Machinability aspects concerning micro-turning of PA66-GF30-reinforced polyamideLeonardo R. Silva; J. Paulo Davim; Antonio Festas; A. M. Abrao20092009, vol.41, no.9-10
Variable sampling inspection plans with screening for assuring average outgoing surplus quality loss limit indexed by Taguchi's lossMaiko Morita; Ikuo Arizono; Yasuhiko Takemoto20092009, vol.41, no.9-10
A novel CNC grinding method for the rake face of a taper ball-end mill with a CBN spherical grinding wheelFang Chen; Hongzan Bin20092009, vol.41, no.9-10
A resource allocation method based on competitiveness equilibrium for manufacturing gridShengyou Shi; Haicheng Yang; Haibin Liu; Junjie Hou20092009, vol.41, no.9-10
Parallel processor scheduling for minimizing total weighted tardiness using ant colony optimizationN. R. Srinivsa Raghavan; M. Venkataramana20092009, vol.41, no.9-10
Integration of marketing research techniques into house of qualify and product family designR. B. Kazemzadeh; Majid Behzadian; Mohammad Aghdasi; Amir Albadvi20092009, vol.41, no.9-10
An integrated vendor-buyer cooperative model under stochastic supply lead-timeMohsen Sheikh Sajadieh; Mohammad Reza Akbari Jokar20092009, vol.41, no.9-10
Study on manufacturing grid resource service QoS modeling and evaluationFei Tao; Yefa Hu; Dongming Zhao; Zude Zhou; Haijun Zhang; Zhenzhen Lei20092009, vol.41, no.9-10
A simulated annealing algorithm to find approximate Pareto optimal solutions for the multi-objective facility layout problemRamazan Sahin; Orhan Turkbey20092009, vol.41, no.9-10
A game-theory approach for job scheduling in networked manufacturingGuanghui Zhou; Pingyu Jiang; George Q. Huang20092009, vol.41, no.9-10
12