期刊


ISSN0268-3768
刊名The International Journal of Advanced Manufacturing Technology
参考译名先进制造技术国际杂志
收藏年代1998~2024



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023 2024

2009, vol.40, no.11-12 2009, vol.40, no.1-2 2009, vol.40, no.3-4 2009, vol.40, no.5-6 2009, vol.40, no.7-8 2009, vol.40, no.9-10
2009, vol.41, no.11-12 2009, vol.41, no.1-2 2009, vol.41, no.3-4 2009, vol.41, no.5-6 2009, vol.41, no.7-8 2009, vol.41, no.9-10
2009, vol.42, no.1/2 2009, vol.42, no.11/12 2009, vol.42, no.3/4 2009, vol.42, no.5/6 2009, vol.42, no.7/8 2009, vol.42, no.9/10
2009, vol.43, no.1/2 2009, vol.43, no.11/12 2009, vol.43, no.3/4 2009, vol.43, no.5/6 2009, vol.43, no.7/8 2009, vol.43, no.9/10
2009, vol.44, no.1/2 2009, vol.44, no.11/12 2009, vol.44, no.3/4 2009, vol.44, no.5/6 2009, vol.44, no.7/8 2009, vol.44, no.9/10
2009, vol.45, no.1/2 2009, vol.45, no.11/12 2009, vol.45, no.3/4 2009, vol.45, no.5/6 2009, vol.45, no.7/8 2009, vol.45, no.9/10

题名作者出版年年卷期
Predicting a model for agile NPD process with fuzzy cognitive map: the case of Iranian manufacturing enterprisesRoxana Fekri; Alireza Aliahmadi; Mohammad Fathian20092009, vol.41, no.11-12
Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardinessB. Naderi; M. Zandieh; V. Roshanaei20092009, vol.41, no.11-12
A structural approach to the non-blocking supervisory control of discrete-event systemsLei Feng; Kai Cai; W. M. Wonham20092009, vol.41, no.11-12
A heuristic technique for inventory replenishment policy with increasing demand pattern and shortage allowanceRirin Diar Astanti; Huynh Trung Luong20092009, vol.41, no.11-12
A two-level distribution inventory system with stochastic lead time at the lower echelonA. Thangam; R. Uthayakumar20092009, vol.41, no.11-12
Single-machine scheduling with past-sequence-dependent setup times and effects of deterioration and learningJi-Bo Wang; Yong Jiang; Gang Wang20092009, vol.41, no.11-12
A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problemAlireza Rahimi-Vahed; Mostafa Dangchi; Hamed Rafiei; Ehsan Salimi20092009, vol.41, no.11-12
Computer aided inspection: design of customer-oriented benchmark for noncontact 3D scanner evaluationEnrico Vezzetti20092009, vol.41, no.11-12
Real-time NURBS interpolator: application to short linear segmentsJun-Bin Wang; Hong-Tzong Yau20092009, vol.41, no.11-12
Approach for uncertainty analysis and error evaluation of four-axis co-ordinate measuring machinesJoao Bosco de Aquino Silva; Robert J. Hocken; Jimmie A. Miller; Gregory W. Caskey; Prashanth Ramu20092009, vol.41, no.11-12
12